How to install container prefab houses?
The installation steps of prefab houses usually include the following main steps:
Measurement and planning
Before installation, it is necessary to measure the dimensions of the prefabricated building, including length, width, and height, as well as the slope of the ground. Based on the measurement results and design drawings, plan the specific layout and installation location of the container prefab house.
Assembly structure
According to the design drawings, assemble the framework of the container room (such as steel frames, beams, etc.). Use bolts, nuts, and other connectors to secure the frame together and ensure its stability.
Installation of wall
Install the pre made wall panels according to the requirements of the design drawings. Use bolts, rivets, and other connectors to fix the wall panels to the frame.
Installation of doors and windows
According to the design drawings, measure the specific positions of doors and windows on the walls of the prefab houses. Install the doors and windows in the reserved positions and secure them with screws and other connectors. Ensure flexible opening and closing of doors and windows, and good sealing performance.
Roof installation
Assemble the roof structure according to the design drawings. Install the pre made roof panels according to the requirements of the design drawings. Fix the roof panel to the roof frame using bolts, rivets, and other connecting components.
Interior and exterior decoration and equipment installation
According to customer needs, interior and exterior decoration of container prefab houses, including wall, floor, ceiling and other parts. Use appropriate decoration materials and techniques to ensure that the decoration quality meets the standards.
Equipment installation
Install electrical systems, water supply and drainage systems, and other equipment to ensure the normal use of prefabricated buildings. Perform necessary debugging and testing to ensure that the equipment is functioning properly.